Contracted Power (Potencia) for Communities in Spain
Contracted power is one of the biggest drivers of communal electricity standing charges. Many communities remain significantly overcontracted for years, leading to unnecessarily high annual costs.
Potencia Contratada Summary
What Is Potencia?
The kW limit available to your community at any given moment. You pay for this every day regardless of usage.
Why It Matters
It determines the 'standing charge' (término de potencia), which can be 40-50% of the total bill.
Standing Charges
Billed per kW per day. If you contract 40kW but only use 20kW, you are wasting 50% of this cost.
Overpayment
Most communities use legacy settings from when the building was first commissioned.
What Is Contracted Power?
Contracted kW Capacity
Think of it as the 'size of the pipe'. It limits how many lifts, pumps, and lights can run simultaneously without incurring penalties.
Availability vs Usage
Unlike 'energy usage' (kWh), which you pay for as you consume it, 'potencia' is a fixed reservation fee for availability.
The Standing Charge
Technically known as the 'Término de Potencia', this is the cost paid to the distributor for maintaining the grid capacity to your CIF.
How Potencia Works in Spain
| Period | Cost Level | Function |
|---|---|---|
| P1 | Highest | Morning & evening peaks |
| P2-P5 | Medium | Variable mid-day and transition |
| P6 | Lowest | Nights (00:00-08:00) and weekends |
Why Communities Often Overcontract
Inherited Contracts
New Presidents and Administrators often inherit the original 'Project Power' from 15 years ago.
Safety Margins
Fear of the 'ICP' (power trip) leads to massive oversized buffers that are never actually needed.
Administrator Inertia
Reviewing 12 months of maxímetro data is time-consuming and often ignored unless requested.
Standing Charges & Annual Cost Impact
Lift Startup Myths & Real Demand
Pool Equipment & Demand Behaviour
Excess Demand & Penalties
How Communities Review Potencia
Potencia by Community Type
| Community Type | Typical Potencia | Main Infrastructure | Annual Savings Opp. | |
|---|---|---|---|---|
| Small Block (15-20 units) | 20 kW | 1 Lift, Hallway LED | Check bill | €450 |
| Mid Urbanisation | 45 kW | 2 Pools, 4 Lifts | Check bill | €1,850 |
| Luxury Resort | 120 kW+ | Heated Pools, Spas | Check bill | €5,200+ |
Potencia Optimization Examples
Annual Bill Reduction
Annual Bill Reduction
Annual Bill Reduction
Annual Bill Reduction
Common Potencia Mistakes
The 'ICP' Fear
Waiting for the power to trip. In 3.0TD, the power doesn't trip; it just records a peak.
Uniform Contracting
Contracting the same power for all 6 periods. P6 (night) power is cheaper and can be higher without much cost impact.
Potencia Optimisation Checklist
Potencia FAQ
Practical answers about communal standing charges.
Get a Free Independent Community Electricity Review
Many communities in Spain remain on outdated commercial electricity contracts for years without proper analysis. Upload a recent electricity bill and we’ll provide a clear independent review of potential savings opportunities.
